一些检查失败了
changelog-filename-gate / validate (push) Failing after 2s
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2.5 KiB
2.5 KiB
schema, ticket, title, consumer, author, change_type, backend_status, gateway_status, frontend_status, frontend_owner, frontend_ref, target_release, verified_at, status_note, updated_at, base
| schema | ticket | title | consumer | author | change_type | backend_status | gateway_status | frontend_status | frontend_owner | frontend_ref | target_release | verified_at | status_note | updated_at | base |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| hl-changelog/v2 | frontend-order-vehicle-arrange-display | 订单详情「用车安排」展示优化:逐日行按车聚合 + 换版沿用语义标注 | admin | wx(GIT) | 前端优化 | not_required | not_required | pending | mmg | 纯前端展示优化,后端字段已足够;两点:DAILY_V3 逐日镜像行按(车,司机)聚合展示;#5784 换版后沿用车辆加「沿用」语义避免与「车控处理中」并显造成困惑。 | 2026-08-10 | dev-v3 |
订单详情: 用车安排展示优化(按车聚合 + 沿用语义)
wx 2026-08-10 实测反馈两处(TEST 订单 26-9313)。
问题 1:逐日行平铺重复(截图:同一辆车/司机出现 3 次 × 2 车 = 6 行)
DAILY_V3 配车快照是「逐服务日 × 车辆槽位」的明细(2 车 × 3 天 = 6 行数据,数据本身正确),前端把 vehicleGroup.assignments[] 每行直接平铺渲染。
建议:按(车牌/司机 或 assignmentId 前缀相同的槽)聚合成一张车卡,卡内展示服务日期范围或日期 chips。后端行含 serviceDate(逐日镜像)或 startDate/endDate/serviceDays(feign 聚合段),聚合信息足够,无需后端改动。
问题 2:换版后沿用车辆缺「沿用」语义(易被当成残留数据)
改用车需求(如 mpv×2 → mpv×1+suv×1)后,签名匹配的槽位自动沿用旧派车(SRS §9.18 #2 拍板:派单确认后是独立资产,不误撤已通知司机的派单)。此时详情呈现为「需求摘要=车控处理中」+ 一辆「已回配」的车并列,定制师会误以为是旧数据残留(wx 今日即如此反馈)。
建议:
- 当前需求部分槽位已配、部分待配时,头部状态细化为「部分回配(1/2)」而非笼统「车控处理中」;
- 沿用槽位的车卡加「沿用」小徽标(新需求版本仍在处理中、但该车延续自上一版方案)。
判定数据:vehicleGroup.requirement.status=PROCESSING/PENDING 且 assignments 非空 ⇒ 即「部分回配/沿用」形态(回配完成时 status=DONE)。
关联 / 联系人
链接
- 相关工单: #5784(换版保留/沿用规则落地)