hl-api-changelog/changelogs-v2/2026-08/10_frontend_订单详情用车安排按车聚合与沿用语义-前端优化-管理后台.md
API Changelog Bot a133aa7a50
一些检查失败了
changelog-filename-gate / validate (push) Failing after 2s
docs(changelog): 车务看板聊天角标实时化(#5792 后端已齐待前端接) + 订单详情用车安排按车聚合与沿用语义(前端优化×2)
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-10 14:57:44 +08:00

2.5 KiB

schema, ticket, title, consumer, author, change_type, backend_status, gateway_status, frontend_status, frontend_owner, frontend_ref, target_release, verified_at, status_note, updated_at, base
schema ticket title consumer author change_type backend_status gateway_status frontend_status frontend_owner frontend_ref target_release verified_at status_note updated_at base
hl-changelog/v2 frontend-order-vehicle-arrange-display 订单详情「用车安排」展示优化:逐日行按车聚合 + 换版沿用语义标注 admin wx(GIT) 前端优化 not_required not_required pending mmg 纯前端展示优化,后端字段已足够;两点DAILY_V3 逐日镜像行按(车,司机)聚合展示;#5784 换版后沿用车辆加「沿用」语义避免与「车控处理中」并显造成困惑。 2026-08-10 dev-v3

订单详情: 用车安排展示优化(按车聚合 + 沿用语义)

wx 2026-08-10 实测反馈两处TEST 订单 26-9313

问题 1逐日行平铺重复截图同一辆车/司机出现 3 次 × 2 车 = 6 行)

DAILY_V3 配车快照是「逐服务日 × 车辆槽位」的明细2 车 × 3 天 = 6 行数据,数据本身正确),前端把 vehicleGroup.assignments[] 每行直接平铺渲染。

建议:按(车牌/司机 或 assignmentId 前缀相同的槽)聚合成一张车卡,卡内展示服务日期范围或日期 chips。后端行含 serviceDate(逐日镜像)或 startDate/endDate/serviceDaysfeign 聚合段),聚合信息足够,无需后端改动。

问题 2换版后沿用车辆缺「沿用」语义易被当成残留数据

改用车需求(如 mpv×2 → mpv×1+suv×1后,签名匹配的槽位自动沿用旧派车SRS §9.18 #2 拍板:派单确认后是独立资产,不误撤已通知司机的派单)。此时详情呈现为「需求摘要=车控处理中」+ 一辆「已回配」的车并列,定制师会误以为是旧数据残留wx 今日即如此反馈)。

建议

  • 当前需求部分槽位已配、部分待配时,头部状态细化为「部分回配1/2」而非笼统「车控处理中」;
  • 沿用槽位的车卡加「沿用」小徽标(新需求版本仍在处理中、但该车延续自上一版方案)。

判定数据:vehicleGroup.requirement.status=PROCESSING/PENDINGassignments 非空 ⇒ 即「部分回配/沿用」形态(回配完成时 status=DONE

关联 / 联系人

链接

  • 相关工单: #5784(换版保留/沿用规则落地)

联系人

  • 后端负责人: @wx
  • 前端负责人: @mmg