chore(changelog): 7526 前端交付回写 verified
changelog-filename-gate / validate (push) Failing after 3s

团期物料门复判与兜底重扫:hl-admin 36c9064a 在团期详情页
onContractActionSuccess 补 fetchDetailSafe 重拉主详情,出具/签署触发物料门
自动推进时状态立即刷新。frontmatter 翻 verified + owner + ref + status_note。
这个提交包含在:
Mimingguang
2026-09-12 07:46:16 +08:00
父节点 37904dc20f
当前提交 a0d72720a6
@@ -7,12 +7,12 @@ author: "jw(GIT)"
change_type: "新增接口"
backend_status: "deployed"
gateway_status: "verified"
frontend_status: "pending"
frontend_owner: ""
frontend_ref: ""
frontend_status: "verified"
frontend_owner: "mmg"
frontend_ref: "36c9064a"
target_release: ""
verified_at: "2026-09-12"
status_note: ""
status_note: "前端 2026-09-12 已交付(hl-admin 36c9064a):实证缺口在团期详情页 onContractActionSuccess 只刷合同看板/芯片明细、未重拉团期主详情(同页其它回调均调 fetchDetailSafe);补 store.fetchDetailSafe(id) 重拉主详情含 batchStatus,出具/签署触发物料门自动推进时状态立即刷新。运维端点 recheck-material-gate 与兜底 Job /v3/internal/**(网关403)前端不对接。checkpoint 7 项全绿(含生产构建)。"
updated_at: "2026-09-12"
base: "dev-v3"
---